Publication Category: Technical Annex

Updated:

Latest Updates

Technical annex – Natural Capital in the Second National Infrastructure Assessment
Picture of a sunset over rolling green hills in Dorset

Technical annex – Natural Capital in the Second National Infrastructure Assessment

9 Nov 2023
Impact and costings for recommendations in the Second National Infrastructure Assessment
Leeds urban transport

Impact and costings for recommendations in the Second National Infrastructure Assessment

25 Oct 2023
Technical annex – Distributional analysis
Blurred crowd of people on a UK high street

Technical annex – Distributional analysis

18 Oct 2023
Technical annex – Hydrogen heating
Woman and child wearing colorful pair of woolly socks warming cold feet in front of heating radiator in winter time. Electric or gas heater at home.

Technical annex – Hydrogen heating

How the Commission arrived at its recommendation that government should not support the rollout of hydrogen heating.

18 Oct 2023
Surface water flooding study: cost and impact note
Car driving through floodwater

Surface water flooding study: cost and impact note

21 Dec 2022
Surface water flooding modelling technical annex: investment analysis
Flooded car park

Surface water flooding modelling technical annex: investment analysis

29 Nov 2022
Baseline Report Annex A: Digital
Landscape image of fibre optic cables

Baseline Report Annex A: Digital

Analysis of the UK's digital infrastructure which informs the Second National Infrastructure Assessment: Baseline Report.

15 Nov 2021
Baseline Report Annex B: Energy
Image showing a wind turbine being built landscape

Baseline Report Annex B: Energy

Analysis of the UK's energy generation infrastructure which informs the Baseline Report.

15 Nov 2021
Baseline Report Annex C: Flood resilience
Picture showing a car stuck in floodwater under a bridge

Baseline Report Annex C: Flood resilience

Analysis of the country's approach to flood risk management, which informs the Baseline Report.

15 Nov 2021
Baseline Report Annex D: Water and wastewater
Picture showing water leaking from a burst water main

Baseline Report Annex D: Water and wastewater

Analysis of the country's water and wastewater infrastructure which informs the Baseline Report for the second National Infrastructure Assessment.

15 Nov 2021
Baseline Report Annex E: Waste
Picture showing a Puffin carrying domestic waste in its beak

Baseline Report Annex E: Waste

Analysis of the UK's waste infrastructure which informs the Baseline Report for the second National Infrastructure Assessment.

15 Nov 2021
Baseline Report Annex F: Transport
Picture showing traffic congestion in Bristol

Baseline Report Annex F: Transport

Analysis of the country's transport infrastructure which informs the Baseline Report for the second National Infrastructure Assessment.

15 Nov 2021
Behaviour change scenario development methodology
close up of male hands nightlight smartphone

Behaviour change scenario development methodology

13 May 2021
Principles for setting levels of service
Cover of the technical annex for principles of setting service levels

Principles for setting levels of service

21 Jul 2020
Resilience impact and costing note
Cover of the technical annex - impact and costing note for the resilience study

Resilience impact and costing note

21 Jul 2020

Evidence_Icon_Turquoise Created with Sketch.

Explore data used in the Commission's research, and gain insights from across UK infrastructure