Every local transport authority should have a long term infrastructure strategy

Published: Updated:

Every local transport authority should have a long term infrastructure strategy for the towns in its area, supported by a pipeline of projects. These strategies should be developed locally and collaboratively as part of, or complementary to, distinctive 15 year place based plans for the economic development of towns. Infrastructure strategies and wider plans should draw on local strengths, presenting a distinctive vision for towns. To ensure accountability, infrastructure strategies and wider plans should set out clear, transparent outcomes and, at the end of each five year funding period (see recommendation 2), local authorities will need to carry out assessments of whether those outcomes have been achieved.

Share this article

<

Recent Articles

Coming up in 2022
Thumbtack pins in calendar concept for busy, appointment and meeting reminder

Coming up in 2022

This page shows a calendar reflecting the latest expected dates for Commission reports, publications and events. You can also sign up to receive our quarterly newsletter by entering your email address in the box at the very foot of our homepage; or sign up to receive updates specifically on the programme for the second National...

22 Feb 2022 By
We’re recruiting – Senior policy adviser
Digital city image

We’re recruiting – Senior policy adviser

We have a great opportunity for an experienced policy professional with an interest in and good experience of the digital infrastructure space, but who also has the breadth of skills and knowledge that would allow them to work across all areas of our policy remit. Work is underway in earnest on our second National Infrastructure...

17 Aug 2022 By
We’re recruiting – Head of Governance
Image of a meeting pack

We’re recruiting – Head of Governance

The operational independence of the Commission is crucial both to the credibility of the advice it provides to government and its capacity to deliver its responsibilities effectively. To help achieve that, the Commission is supported by a number of boards and committees that oversee and monitor its performance and ensure that its duties are performed...

17 Aug 2022 By
Armitt on drought resilience: fixing leaks, reducing demand, building supply
Dry soil and patchy grass

Armitt on drought resilience: fixing leaks, reducing demand, building supply

In a comment piece for The Times’ Red Box, Commission Chair Sir John Armitt today sets out steps to help reduce the risk of future severe drought in England. The piece, reproduced below, argues for further action on identifying leaks, expanding water metering and reducing consumer demand, and building new supply and transfer infrastructure. Sir...

8 Aug 2022 By

Evidence_Icon_Turquoise Created with Sketch.

Explore data used in the Commission's research, and gain insights from across UK infrastructure

Join our team of professionals supporting the Commission to provide evidence based and forward thinking advice on infrastructure strategy.