Rolling out charging infrastructure to enable 100 per cent electric new car and van sales by 2030

Published: Updated:

The Commission recommends that government, Ofgem and local authorities should enable the roll out of charging infrastructure sufficient to allow consumer demand to reach close to 100 per cent electric new car and van sales by 2030. Government should address the implications of technological innovation in long term transport planning processes, including the next rail control period and road investment strategy.

  • Ofgem should take on the role of regulating the interaction between electric vehicle charge points and the electricity network immediately, ensuring that electric vehicle charging and vehicle to grid services contribute to the optimisation of the energy system. Government, industry and Ofgem should work together to set minimum standards for a network of interoperable, smart charge points
  • Ofgem should commission electricity network operators to work with charge point providers to identify potential anticipatory investments required to accommodate public charging infrastructure. Opportunities for investment within the current price control period should be identified by Summer 2019
  • Government should place a requirement on local authorities to work with charge point providers to allocate 5 per cent of their parking spaces (including on-street) by 2020 and 20 per cent by 2025 which may be converted to electric vehicle charge points
  • Government should subsidise, by 2022, the provision of rapid charge points in rural and remote areas, where the market will not deliver in the short term
  • Government should establish a centre for advanced transport technology in the Department for Transport to bring together work on technological innovation and ensure its implications are central to future investment proposals. This should include developing and overseeing the Commission’s proposed connected and autonomous vehicles framework.

Share this article

<

Recent Articles

Welcome for “critical first step” on CCS clusters
Scene showing industrial cranes silhouetted at sunset over Teessport, Middlesbrough

Welcome for “critical first step” on CCS clusters

Government has today (4 October 2024) announced £22bn of funding to support the first two ‘clusters’ of carbon capture and storage technology, in Teesside and Merseyside. Responding to the announcement, Nick Winser, Commissioner at the National Infrastructure Commission said: “This technology is crucial for key industries and the power sector to decarbonise. Today’s announcement is...

4 Oct 2024 By
Clearer standards needed to boost economy’s resilience
Image of hand putting back up collapsed wooden blocks

Clearer standards needed to boost economy’s resilience

Government should set clear standards of resilience that infrastructure operators must maintain in the face of sudden shocks, the National Infrastructure Commission has reiterated in a new report.  Climate change and related weather extremes, alongside a heightened reliance on digital technologies, mean that the UK faces increased risks of vital networks and services being unavailable...

19 Sep 2024 By
Electricity distribution key challenge for East of England infrastructure, Commission hears
Team at a substation

Electricity distribution key challenge for East of England infrastructure, Commission hears

The infrastructure challenges in Cambridge and its surrounding region were the focus of a visit to Cambridgeshire and Bedfordshire for Commissioners and staff which considered in particular how the wider region’s future electricity needs can be effectively managed. At a roundtable hosted for the Commission by Cambridgeshire & Peterborough Combined Authority Mayor Dr Nik Johnson...

2 Aug 2024 By

Evidence_Icon_Turquoise Created with Sketch.

Explore data used in the Commission's research, and gain insights from across UK infrastructure

Join our team of professionals supporting the Commission to provide evidence based and forward thinking advice on infrastructure strategy.