Government should reform governance arrangements to enable the transformational change in network infrastructure that will be required to support a decarbonised electricity system, including:

  • completing the setup of the Independent System Operator by the end of 2024, and ensuring it has the duties, tools and access to data necessary to plan and manage interactions between energy vectors
  • ensuring the Independent System Operator has a duty to develop and maintain a strategic spatial energy plan, with the first version of this plan in place by 2025 and updated regularly
  • providing strategic clarity to Ofgem through the Strategy and Policy Statement by the end of 2023 on the need for investment in electricity distribution and local flexibility solutions ahead of need that are sufficient to meet the demands of electric vehicles and heat pumps implied by carbon budgets
  • establishing the Regional System Planners proposed by Ofgem in time to inform the next electricity distribution price control in 2028.

Share this article

<

Recent Articles

Welcome for “critical first step” on CCS clusters
Scene showing industrial cranes silhouetted at sunset over Teessport, Middlesbrough

Welcome for “critical first step” on CCS clusters

Government has today (4 October 2024) announced £22bn of funding to support the first two ‘clusters’ of carbon capture and storage technology, in Teesside and Merseyside. Responding to the announcement, Nick Winser, Commissioner at the National Infrastructure Commission said: “This technology is crucial for key industries and the power sector to decarbonise. Today’s announcement is...

4 Oct 2024 By
Clearer standards needed to boost economy’s resilience
Image of hand putting back up collapsed wooden blocks

Clearer standards needed to boost economy’s resilience

Government should set clear standards of resilience that infrastructure operators must maintain in the face of sudden shocks, the National Infrastructure Commission has reiterated in a new report.  Climate change and related weather extremes, alongside a heightened reliance on digital technologies, mean that the UK faces increased risks of vital networks and services being unavailable...

19 Sep 2024 By
Electricity distribution key challenge for East of England infrastructure, Commission hears
Team at a substation

Electricity distribution key challenge for East of England infrastructure, Commission hears

The infrastructure challenges in Cambridge and its surrounding region were the focus of a visit to Cambridgeshire and Bedfordshire for Commissioners and staff which considered in particular how the wider region’s future electricity needs can be effectively managed. At a roundtable hosted for the Commission by Cambridgeshire & Peterborough Combined Authority Mayor Dr Nik Johnson...

2 Aug 2024 By

Evidence_Icon_Turquoise Created with Sketch.

Explore data used in the Commission's research, and gain insights from across UK infrastructure

Join our team of professionals supporting the Commission to provide evidence based and forward thinking advice on infrastructure strategy.