National Infrastructure Assessment 1   |   Report

Cost analysis of future heat options

Research by Element Energy analyses different models and scenarios for future heat generation

Tagged: Energy & Net Zero

This model and input scenarios generate many of the results presented in the report Cost analysis of future heat infrastructure options. The report was produced by Element Energy Limited and E4Tech and published alongside the Commission’s National Infrastructure Assessment.
The model and input scenarios were produced by Element Energy for the Commission and are published here with their permission. A compressed .zip file, downloadable here, contains the following files:

The model

  • Heat infrastructure model V113.xlsb

Input scenarios

  • ASHP + bioenergy.xlsx
  • H2 + biomass gasification + off-grid storage heating.xlsx
  • H2 + storage heating.xlsx
  • H2_Tier 6.xlsx
  • Heat pump_MCEE.xlsx
  • HP_HCEE.xlsx
  • Hybrid heat pumps.xlsx
  • Hybrids + GI + storage heating.xlsx
  • Hydrogen + off grid biomass.xlsx
  • Status Quo.xlsx
  • A note explaining how to use the scenario and model spreadsheets: heat model – a guide.docx

Disclaimer: The results produced by this model rely entirely on the inputs entered and underlying assumptions. All results should be challenged and checked before publication or off-model use. Element Energy accepts no responsibility for the use of custom model runs. Element Energy Limited gives no guarantee, nor should any be implied, with regards to the result of this model

Man among huge solar power plant

Status:  Completed

National Infrastructure Assessment 1

An assessment of the United Kingdom's infrastructure needs up to 2050.

View the study

Evidence_Icon_Turquoise Created with Sketch.

Explore data used in the Commission's research, and gain insights from across UK infrastructure

Join our team of professionals supporting the Commission to provide evidence based and forward thinking advice on infrastructure strategy.